Support Trailer Setup

MARA SUPPORT TRAILER

CHECK LIST

SETUP

      Position Trailer 70’ from Commo Trailer

      Level Trailer and drop support jacks

      Break out Spider Box &  Power Cord

      Check Fuel and Oil in Generator, set fuel to on

      Preheat Generator/Glow Plugs

      Start Generator

      Check power and turn breakers on in Commo Trailer

      Prep Tower for installing Rotor and Beam

      Install Rotor, Beam and G5RV hoisting rope

      Raise Tower

      Install G5RV inverted V

   Check Fuel Level Every 4 Hours

   Check Oil Leve Every 24 Hours

TEARDOWN

      Secure HF Station

      Drop Inverted V/G5RV

      Drop Tower and remove Beam and Rotor

      Retract Support Trailer Jacks

      Shift Commo Trailer to Battery Operation

      Secure Generator, pick up spider box and AC Cables

      Check Fuel Level

      Turn off Fuel valve.

      Store equipment in Support Trailer Storage Box

      Inspect Commo & Support Trailers for Travel